Cemengal has received an order from Cement Australia to supply a new greenfield cement and slag grinding plant in Port Kembla (Australia). Cemengal as main contractor for this project will be responsible for the total design of all equipments, foundations and structures. Also, the total structural supply and the process design and supply of mechanical, electrical and process control equipment.
The project will include the installation of a Gebrüder Pfeiffer MVR 6000 C6 vertical roller mill with a production capacity of 950.000 tpa cement and 150.000 tpa GGBFS.
To storage these products, Cemengal will design and supply 7 metallic silos of 3.000 tonnes each.
For further information, see: www.cemengal.com